Repair and Conversion

Bollinger Algiers

Bollinger Algiers offers customers a deep water facility on the Mississippi River with complete marine repair capabilities and the capacity to dry dock vessels weighing up to 4,000 tons.

Location Information

434 Powder St P.O. Box 6068 New Orleans, LA 70114
Mailing Address: 434 Powder St P.O. Box 6068 New Orleans, LA 70114
Phone : 504-362-7960

Fax : 504-361-1679

Manager: Elvin Cheramie, General Manager

Facility/Dry Dock

With 465 feet of wet dock Bollinger Algiers can accommodate vessels for top-side repair and project load-outs. Two floating dry docks further enhance the facility’s ability to provide efficient and cost-effective repair services to its customers.

Two tower cranes at Bollinger Algiers facilitate work on vessels in the dry dock and wharf area. The facility also has a mobile crane barge for servicing customers and, with a machine shop on site, Bollinger Algiers is available around the clock to satisfy customers’ needs.

The company has established a premier reputation for superior quality and timely services for its customers.

Dry Dock Specifications

Dry Docks - Bollinger Algiers
Dock 1 "Miss DarbyDock 2 “Mrs. Jody”
Lifting Capacity1,800 tons4,000 tons
Length160 ft. (w/one 20ft. apron)198 ft.
Clearance Inside70 ft.76 ft.
Wing Wall Depth28 ft.31 ft.

Support Services

A full service shipyard with on-site machine shop and access to all Bollinger support facilities.

Bollinger Algiers Services

» Full Marine Service

» Machine Shop

» Manufacturing

Services Offered through the Bollinger Network

» Propeller and Vibration analysis service for new construction and repair

» Project Engineering and Fabrication Services

» Machine Shops

» Armature Services

» Hydraulic Services

» Blasting and Coating Services – Offsite

» Engineering and Naval Architects

» Logistics Support by CHAND

434 Powder Street

434 Powder Street, New Orleans, LA, USA

View larger map

EXPLORE OTHER LOCATIONS

Menu